1. Einleitung
This manual provides essential instructions for the safe installation, operation, and maintenance of the Zoeller Sewage Package System with Alarm, Model 915-0005. This system is designed for efficient and reliable handling of sewage and wastewater in residential or light commercial applications. Please read this manual thoroughly before installation or use to ensure proper function and to prevent injury or damage.
2. Wichtige Sicherheitshinweise
WARNING: Risk of electric shock, fire, or injury. Always disconnect power before servicing the pump or alarm system.
- Stellen Sie sicher, dass alle elektrischen Anschlüsse den örtlichen Vorschriften und Bestimmungen entsprechen.
- Betreiben Sie die Pumpe nicht mit einem beschädigten Kabel oder Stecker.
- Never handle the pump or alarm system with wet hands or while standing in water.
- This system is designed for sewage and wastewater. Do not use for flammable liquids or chemicals.
- Keep children and unauthorized personnel away from the system.
- Wear appropriate personal protective equipment (PPE) when working with the system.
3. Systemkomponenten
The Zoeller Sewage Package System (Model 915-0005) includes the following main components:
- Sewage Pump Assembly with Basin Deckel
- Alarmanlage
- Rückschlagventil
- Power Adapter for Alarm
- Mounting Hardware (e.g., hose clamp)

Figure 1: Main Sewage Package System. This image shows the complete pump assembly, including the pump motor submerged in the basin, the discharge pipe, and the black lid with electrical cords and float switches.

Figure 2: Accessory Components. This image displays the separate alarm unit (black box), a quiet check valve (grey cylinder), a power adapter, and a metal hose clamp, which are included with the system.
4. Einrichtung und Installation
Proper installation is critical for the system's performance and longevity. If you are unsure about any step, consult a qualified professional.
4.1 Standortvorbereitung
- Ensure the installation area is clean, level, and provides adequate space for maintenance.
- Verify that the electrical supply meets the pump's requirements (AC/DC, as specified).
- Confirm that plumbing connections for inlet and discharge pipes are ready.
4.2 Pump and Basin Installation
- Place the sewage basin in its designated location.
- Senken Sie die Pumpe in das b ab.asin, ensuring it sits level on the bottom.
- Connect the discharge pipe from the pump to the main discharge line. Use the provided check valve in the discharge line to prevent backflow.
- Connect the inlet pipe(s) to the basin.
- Sichern Sie das basin lid, ensuring all electrical cords pass through the designated openings without pinching.
4.3 Alarm System Installation
- Mount the alarm unit in a dry, accessible location, away from direct moisture.
- Connect the alarm float switch cable from the basin to the alarm unit.
- Plug the alarm power adapter into a standard electrical outlet.
- Test the alarm by manually lifting the alarm float switch to ensure it activates.
4.4 Elektrische Anschlüsse
- Plug the pump's power cord into a dedicated, grounded electrical outlet.
- Stellen Sie sicher, dass alle Verbindungen sicher und vor Feuchtigkeit geschützt sind.
5. Bedienungsanleitung
The Zoeller Sewage Package System operates automatically. The pump will activate when the liquid level in the basin rises to the "ON" float switch level and will turn off when the level drops to the "OFF" float switch level.
5.1 Normalbetrieb
- Once installed and powered, the system will monitor the liquid level.
- The pump will cycle on and off as needed to maintain the desired liquid level.
5.2 Alarmsystem
- If the liquid level rises above the normal operating range (e.g., due to pump failure or blockage), the alarm float switch will activate.
- The alarm unit will emit an audible alert and/or visual indicator.
- Upon alarm activation, investigate the cause immediately and take corrective action. Silence the alarm by pressing the designated button on the alarm unit, but note that it may reactivate if the high-water condition persists.
6. Wartung
Regular maintenance ensures optimal performance and extends the life of your sewage system. Always disconnect power before performing any maintenance.
6.1 Monatliche Kontrollen
- Inspect Floats: Manually lift and lower the pump and alarm float switches to ensure they move freely and activate/deactivate correctly.
- Kontrollkästchen Basin: Visually inspect the basin for excessive debris or buildup.
- Achten Sie auf ungewöhnliche Geräusche: During pump operation, listen for unusual sounds that may indicate a problem.
6.2 Jährliche Inspektion
- Sauber Basin: If necessary, remove the pump and thoroughly clean the basin to remove any accumulated sludge or debris.
- Inspect Pump Impeller: Check the pump impeller for any obstructions or wear.
- Verify Check Valve: Ensure the check valve is functioning properly and not allowing backflow.
- Elektrische Anschlüsse: Inspect all electrical cords and connections for wear, damage, or corrosion.
7. Anleitung zur Fehlerbehebung
Dieser Abschnitt bietet Lösungen für häufige Probleme. Bei Problemen, die hier nicht aufgeführt sind, wenden Sie sich bitte an den Kundendienst.
| Problem | Mögliche Ursache | Lösung |
|---|---|---|
| Pumpe läuft nicht. | No power; tripped breaker; faulty float switch; pump obstruction. | Check power supply and breaker. Inspect float switch for free movement. Disconnect power and check pump intake for debris. |
| Pumpe läuft dauernd. | Stuck float switch; check valve failure; continuous inflow. | Inspect float switch for obstructions. Check check valve for proper closure. Reduce inflow if possible. |
| Der Alarm wird häufig ausgelöst. | Pump failure; discharge line blockage; alarm float switch malfunction. | Check pump operation. Inspect discharge line for blockages. Verify alarm float switch movement. |
| Pumpe ist laut. | Debris in impeller; worn bearings; cavitation. | Disconnect power and clear impeller. Contact service if bearings are suspected. Ensure adequate water level. |
8. Spezifikationen
| Besonderheit | Detail |
|---|---|
| Modellnummer | 915-0005 |
| Marke | Zöller |
| Hersteller | ZOELLER PUMP COMPANY |
| Stil | Über der Erde |
| Material | Foam (Poly Struc Foam for basin) |
| Stromquelle | Wechselstrom/Gleichstrom |
| Artikelpaket Menge | 1 |
9. Garantieinformationen
Zoeller products are manufactured to the highest standards. For specific warranty terms and conditions, please refer to the documentation included with your product or visit the official Zoeller Pump Company webBewahren Sie Ihren Kaufbeleg als Kaufnachweis für eventuelle Garantieansprüche auf.
10. Kundendienst
If you require technical assistance, replacement parts, or have questions regarding your Zoeller Sewage Package System, please contact Zoeller Pump Company customer support. Have your model number (915-0005) and date of purchase ready when contacting support.
Weitere Informationen finden Sie im Zoeller Store on Amazon or the official Zoeller Pump Company webWebsite.





